To work within a customer’s expedited timeline, these speciality conveyors were engineered and built in 40 days. These chassis weldments arrive on four overhead paths and range from 23” to 47” long. They are accumulated in batches on our short, rise-and-fall conveyor, then discharged onto a declining conveyor to a manual, fixture loading station.
Robotic Assembly for Electric Vehicle Motors
Delicate magnet blanks are unloaded, weighed, distributed, and presented to robots for assembly into motors